Raheja Skylight location and connectivity
Raheja Skylight is presented in Lokhandwala Complex, Andheri West, Mumbai. For a homebuyer, connectivity should be assessed at the micro-location level, including the project approach road, public transport access and peak-hour traffic.
Andheri West Metro connectivity
Mumbai Metro Line 2A runs along the Link Road corridor and includes Oshiwara, Lower Oshiwara and Andheri West stations. MMRDA lists the D.N. Nagar interchange with Metro Line 1, and its published status says the Dahanukarwadi to D.N. Nagar phase has been operational since 19 January 2023.
Metro Line 1 and Andheri interchange
Mumbai Metro Line 1 connects Versova, D.N. Nagar, Azad Nagar and Andheri before continuing towards Ghatkopar. MMRDA states that the line provides interchange with the suburban railway at Andheri and with Metro Line 2 at D.N. Nagar. Actual journey times from a project depend on the route and traffic conditions.
Road and neighbourhood access
When comparing properties in Lokhandwala, check access to the Link Road, Juhu-Versova Link Road and other roads used for the buyer's regular commute. Also check the final approach to the building because two projects in the same Andheri West locality can have materially different peak-hour access.
Nearby neighbourhoods buyers may research
- Lokhandwala Complex
- Oshiwara
- Versova
- Juhu-Versova Link Road
- D.N. Nagar
- Andheri West
Official transport sources
For the underlying metro facts, refer to the MMRDA Metro Line 1 overview and the MMRDA Metro Line 2A project features.
Useful Raheja Skylight pages
- Raheja Skylight location
- 3 BHK flats in Andheri West
- 3 BHK in Lokhandwala
- Nearby projects
- Andheri West real estate guide
Before making a location decision
Check the route yourself during weekday peak hours, inspect the immediate streets, and verify the current project address and access points before relying on any online travel estimate.
Request the current price sheet, floor plans, availability or a site visit from the sales desk. Project information can change and should be verified against current project documents.