Why this project keeps coming up in Andheri West
The Mumbai Coastal Road is one of the most-cited pieces of upcoming infrastructure in western-suburb property conversations, because its northern extension is planned to run past Versova, on the western edge of Andheri. Buyers researching Lokhandwala and Andheri West often ask about it, so it is worth understanding what is actually built, what is still under construction, and what is only planned.
What is already operational
The southern stretch of the Coastal Road, connecting Marine Drive to the Bandra-Worli Sea Link in South Mumbai, opened in phases from March 2024 onward. This section is well south of Andheri West and does not itself shorten a Lokhandwala commute — its relevance here is mainly as evidence that the coastal road programme is being delivered, not just announced.
What is under construction: the Versova-Bandra Sea Link
The section that actually matters for Andheri West is the Versova-Bandra Sea Link (VBSL), a roughly 9.6 km cable-stayed sea bridge extending the coastal road north from the Bandra-Worli Sea Link to Versova. It is under construction, with government-side timelines pointing to completion in the 2026–2027 window; independent infrastructure trackers have also noted schedule slippage from the project's original target, which is common for large marine construction works. Treat any completion date as indicative, not guaranteed, until it is formally commissioned.
What it would change for a Lokhandwala resident
Once operational, the Versova-Bandra Sea Link is projected to cut the road journey between Versova and South Mumbai from around ninety minutes of peak-hour traffic to a much shorter sea-link crossing. For a Lokhandwala or Andheri West resident, the practical benefit depends on the exact route to the Versova end of the link and how it integrates with surrounding roads — a benefit that is real in principle but hard to quantify precisely before the connector roads and interchange are actually open and tested at rush hour.
How to use this information responsibly
- Treat "coastal road access" as a medium-term factor, not a commute improvement you can rely on today.
- Ask any project for the actual distance and route to the Versova end of the link, not just the locality name.
- Check for the latest public status before treating a completion date as fixed — large infrastructure projects commonly slip.
- Weigh it alongside connectivity that already exists today, such as Metro Line 1 and Line 2A, rather than in place of it.
Related reading
- Raheja Skylight connectivity guide (Metro Line 1 & 2A)
- Lokhandwala real estate guide
- Andheri West real estate guide
Request the current price sheet, floor plans, availability or a site visit from the sales desk. Project information can change and should be verified against current project documents.